HCDB Group
HCDB Group
location_on Fulham, SW6, London schedule Total Duration: 14 Weeks square_foot 1,850 SQ FT

Hurlingham Road Townhouse

info About This Project

This modern extension transformed a classic Fulham Victorian terrace into an open-plan light-filled family haven. By combining a side-return and rear extension with slimline Crittall steel glass doors, we seamless connected the indoor kitchen space with the landscaped rear garden.

Finished rear kitchen and dining extension in Fulham London showcasing Crittall style black metal glazed facade
Category: Extensions 10-Yr Guarantee
Transparent Unit Rates

Itemised Element Pricing

Unit pricing schedule for distinctive elements of the work executed on this project.

price_check Itemised Unit Rates — No Bundled Totals
payments

Large Format Porcelain Tile Floor Supply & Installation

Unit Price: £14 per square meter
Specification & Finishes

Materials Used

High-spec materials and products specified throughout this property build.

category Large Format Concrete-Effect Porcelain Tiles (120x120cm)

R11 anti-slip exterior grade matching indoor and outdoor patio surfaces

Shop Link (Coming Soon) link
Execution Timeline

Chronological Stages

Step-by-step progression, site photos, videos, and milestone breakdown.

1
Milestone Stage 1

Stage 1: Groundwork, Foundations & Drainage Relocation

timer Duration: 3 Weeks

Demolition of existing rear bay wall, excavation of strip foundations, and Thames Water approved sewer diversion.

photo_library Stage Media (Photos & Videos)

Foundation trenching and concrete slab pouring in Fulham garden

Foundation trenching and concrete slab pouring in Fulham garden

Inquire For Your Property

Request Site Feasibility for a Similar Build

Interested in achieving similar results for your London home? Speak with our surveying team.